SAVE UP TO 70%

Professional refurbishment of wire mesh containers. Achieve the performance of new containers at 1/3 the price.

Refurbishment of logistic carriers: restore full functionality to wire mesh containers in 2 weeks. Save costs, maintain production continuity, and care for the environment.

1/3

PRICE OF NEW

up to 2 weeks

LEAD TIME

10-15 years

OF USE

SAVE UP TO 70%

Professional refurbishment of wire mesh containers. Achieve 100% container efficiency.

1/3 the price

OF A NEW CONTAINER

up to 2 weeks

LEAD TIME

10-15 years

OF USE

Why is it worth refurbishing wire mesh containers instead of buying new ones?

Refurbishment is a practical solution for companies looking to reduce fleet maintenance costs, minimize waste, and maintain warehouse operational continuity.

Cost savings

The cost of refurbishment is 1/3 the cost of purchasing a new container. For a fleet of 100 containers, this means savings of up to 10,000 euros.

Short refurbishment time

Receive fully functional containers within 2 weeks.

HSE standard for safety and durability

After refurbishment, the container is stable, maintains its geometry for stacking, and poses no risk to employees.

Maintain operational continuity

Stabilize carrier availability and standardize the fleet. Fewer downtimes and internal complaints.

Support environmental goals

Extend the lifecycle of carriers and reduce metal waste. Support for sustainable development.

Shift CAPEX costs

Avoid the cost of purchasing new containers or postpone it by as much as 10-15 years.

Do you have damaged containers? Find out how much you can save!

We will conduct a free preliminary assessment and provide a precise cost calculation for refurbishment.

Damage before and after refurbishment

Przed regeneracją 1
Po regeneracji 1
PRZED
PO
Przed regeneracją 2
Po regeneracji 2
PRZED
PO
Przed regeneracją 3
Po regeneracji 3
PRZED
PO
Przed regeneracją 4
Po regeneracją 4
PRZED
PO

Refurbishment vs. purchasing a new carrier

The cost depends on the scope of refurbishment agreed upon with the Client. It amounts to a maximum of 1/3 of the container’s value. In practice, a maximum of up to 40 EURO / piece. Refurbishment is most cost-effective when it allows for reducing the unit cost without losing performance parameters.

Calculate savings through refurbishment

Example savings in your warehouse

10,000 euros saved by choosing refurbishment
Number of carriers for refurbishment 100
Price of new €140.00
Refurbishment price €40.00
Savings per 1 container €100.00

Containers in a stack

Containers in a stack before and after refurbishment

Before refurbishment

container-refurbishment-before

After refurbishment

container-refurbishment-after

Uneven stacks pose a real danger to your employees.

We will conduct a free preliminary assessment and provide a precise cost calculation for refurbishment.

Examples of damage eligible for repair

regeneracja pojemników siatkowych
Bent side wall

Bent side wall

Damaged base foot

Damaged base foot

Bent and dirty label

Bent and dirty label

Bent side wall

Bent stacking details

Wygięta ściana boczna

Wygięta ściana boczna

Uszkodzona stopa podstaw

Uszkodzona stopa podstaw

Wygięta i zabrudzona etykieta

Wygięta i zabrudzona etykieta

Zagięte detale sztaplujące

Zagięte detale sztaplujące

What risks do damaged containers pose?

Occupational safety and health

wire-mesh-container-refurbishment

Decreased efficiency and operational chaos

wire-mesh-container-refurbishment

Financial losses and damaged goods

wire-mesh-container-refurbishment

6 steps to refurbishment

The refurbishment process is carried out in stages to thoroughly assess the condition of the containers, determine the scope of work, restore performance parameters and anti-corrosion protection, and conclude the service with quality control and documentation.

1

Preliminary assessment and qualification.

Based on information (carrier type, quantity, nature of damage, photographic documentation), we initially determine the direction: refurbishment, refurbishment with component replacement, or another solution.

2

Technical assessment at the plant.

Upon receipt of containers, a detailed assessment is performed. If necessary, the carrier is disassembled to check structural components and identify defects not visible 'at first glance'.

3

Repair qualification.

Register of defects qualified for repair.

4

Determining the scope of refurbishment.

After assessment and repair qualification, the exact scope of work is determined.

5

Refurbishment execution.

Commencement of the refurbishment process based on agreed conditions. The choice of solution depends on the terms of cooperation and client requirements.

6

Quality control and documentation.

After assembly, the carrier is checked for functionality and operational safety. As standard, documentation of the completed work (post-refurbishment protocol) is provided. Warranty according to cooperation terms.

License for repair and formal standards in container refurbishment

The refurbishment of wire mesh and metal containers is a process that requires not only knowledge but, above all, strict adherence to safety standards. At Elkom Trade, we make no compromises. We hold all required licenses and certificates, which guarantee that the carriers repaired by us regain their full functionality and safety.

Our certificates

tuv nord

PN-EN ISO
9001:2015

PN-EN
13626:2005

PN-EN ISO 9001:2015

Corporate Social Responsibility

Professional refurbishment – high quality confirmed by our clients

“I confidently recommend Elkom Trade's services in the refurbishment of wire mesh containers. The restoration process was completed on schedule, and the refurbished containers exhibit excellent durability, allowing us to generate tangible financial savings. They are a reliable business partner whose high-quality services perfectly align with our corporate sustainability strategy and our commitment to extending product lifecycles.”
Mathias Lundin Purchaser
Petainer Lidköping AB
“The containers supplied to us are characterized by versatility, high load capacity, resistance to damage, a foldable design, and, above all, high, Polish product quality.”
Management Board Member
Toho Poland
“I confirm the high standards of service and communication. We can recommend Elkom Trade S.A. as a reliable business partner.”
Logistics Division Coordinator
Kolporter

Frequently Asked Questions

Answers to questions about container refurbishment

Various logistic carriers can be refurbished, including gitterboxes, roll containers, metal pallets, pallet collars, and other structures used in intralogistics – provided their technical condition allows for the restoration of performance parameters.

Not only. We also refurbish carriers not manufactured by us. The possibility of refurbishment depends on the type of carrier and its technical condition. In practice, the qualification and profitability of refurbishment are assessed, regardless of the carrier’s origin.

Yes. It is standard practice to provide documentation confirming the scope of refurbishment performed (post-refurbishment protocol).

The lead time depends on the volume and scope of work (e.g., scale of repairs, extent of replacements, required surface protection). The deadline is set at the order acceptance stage. However, it can be assumed that the maximum time is 2 weeks from the moment they are delivered to Elkom Trade’s headquarters in Ostrówiec Świętokrzyski.

In such a situation, a recommendation is presented: refurbishment of selected units, refurbishment with replacement of larger modules, or another cost- and operationally optimal solution. A similar approach can be applied to the refurbishment of warehouse racks, if their technical condition allows.

Inquire about container refurbishment

Fill out the form, and our expert will contact you within 24 hours, or contact our expert directly.

    Dozwolone pliki: JPG, PNG, GIF, maks. 5 MB
    Download the form

    Please enter the address to which you would like the audit form sent

    By submitting this form, you accept the Privacy Policy and consent to being added to the industry newsletter run by Elkom Trade Sp. z o.o. You can unsubscribe or change your details at any time.

    Download the form

    Please enter the address to which you would like the audit form sent

    By submitting this form, you accept the Privacy Policy and consent to being added to the industry newsletter run by Elkom Trade Sp. z o.o. You can unsubscribe or change your details at any time.

    Dziękujemy za przesłanie formularza.